Robotaxi Tracker / Robotaxi 情报站

Independent bilingual tracker of Tesla Robotaxi & Cybercab public progress. 7 cities live (6 unsupervised), fleet est. ~85. Cities: Austin, Dallas, Houston, Miami, Tampa, Orlando, SF Bay Area. Every claim is source-linked. As of 2026-08-31. Not affiliated with Tesla. Not investment advice.

独立双语情报站:特斯拉 Robotaxi / Cybercab 公开进展。已覆盖 7 城(无安全员 6),车队估算 ~85。城市:奥斯汀、达拉斯、休斯顿、迈阿密、坦帕、奥兰多、旧金山湾区。每条数据可点击溯源。截至 2026-08-31。非官方、非投资建议。

Live Robotaxi cities

Key facts (as of 2026-08-31)

Independent tracker. Not affiliated with Tesla, Inc. Not investment advice. Fleet counts are estimates unless marked otherwise. AI/render images are not live road tests. 独立情报站,与 Tesla, Inc. 无关。非投资建议。车队数字除标注外均为估算。AI/渲染图不等于真实路测。

Intel · open source

Robotaxi Tracker

Public Tesla Robotaxi & Cybercab progress — sourced, not spin

As of ·Last updated
Tesla Robotaxi official product image (dark studio / product hero)
Official Tesla product image (digitalassets.tesla.com · Robotaxi-Hero-Desktop). Courtesy of Tesla, Inc. tesla.com/robotaxi
Live citiesSource · 7
6

Austin, Dallas, Houston, Miami, Tampa, Orlando (public commercial). SF Bay Area safety-driver/employee testing tracked separately. Tesla Q2 2026 claims 7 major metros — that figure includes Bay Area; this KPI still counts public commercial only. Official hours 6am–10pm, 7 days/week as of Aug 26 (ops window, not a new city). Dallas service area expanded Aug 29; Austin geofence community-reported ~9% larger Aug 31.

Unsupervised citiesSource · 5
6

Cities with publicly announced unsupervised (no in-car safety monitor) commercial rides.

Fleet (est.)Source · 11
85

Active commercial estimate ~70–100 across live cities (midpoint charted as 85). Not an official Tesla total. Texas TxDMV-style registries show ~269 Robotaxi Model Ys authorized in Texas as of Aug 30, 2026 (was ~181 through Aug 8; +79 registered Aug 27) — registered capacity ≠ daily active. Official @robotaxi said the unsupervised fleet is 'a lot bigger' (Aug 26) without a vehicle count. Austin crowdsource reports ~30 simultaneous active rides on peak days (late Jul). Florida allocation is early/estimate. Confidence: estimate.

CybercabSource · 8
Production started; Sept 3 Austin launch event scheduled

Purpose-built two-seater unveiled Oct 2024. Tesla Q2 2026: production began at Gigafactory Texas (reported annual manufacturing capacity >125k units — capacity, not current output); employee rides on GFTX campus in July; production-vehicle engineering tests on public roads. Starlink V5 integrated (Jul 2026). Accessibility demo (NFB) Jul 2026. Tesla scheduled an invite-only Cybercab launch event at GFTX for Sept 3, 2026 — event/celebration, not yet verified as mass paid public Robotaxi service with Cybercab.

US rollout map

Click a state or city · scrub time · dots scale with fleet

Date: 2026-07-30live: 7fleet: ~85
Alabama (AL)Alaska (AK)Arizona (AZ)Colorado (CO)Florida (FL)Georgia (GA)Indiana (IN)Kansas (KS)Maine (ME)Massachusetts (MA)Minnesota (MN)New Jersey (NJ)North Carolina (NC)North Dakota (ND)Oklahoma (OK)Pennsylvania (PA)South Dakota (SD)Texas (TX)Wyoming (WY)Connecticut (CT)Missouri (MO)West Virginia (WV)Illinois (IL)New Mexico (NM)Arkansas (AR)California (CA)Delaware (DE)District of Columbia (DC)Hawaii (HI)Iowa (IA)Kentucky (KY)Maryland (MD)Michigan (MI)Mississippi (MS)Montana (MT)New Hampshire (NH)New York (NY)Ohio (OH)Oregon (OR)Tennessee (TN)Utah (UT)Virginia (VA)Washington (WA)Wisconsin (WI)Nebraska (NE)South Carolina (SC)Puerto Rico (PR)Idaho (ID)Nevada (NV)Vermont (VT)Louisiana (LA)Rhode Island (RI)PhoenixLas VegasCharlotteNew OrleansSan AntonioAustinDallasHoustonMiamiTampaOrlandoSF Bay Area
Click state or city for details
2026-07-30
States live · UnsupervisedSupervisedUnsupervisedSupervisedPipelineStates live: TX, FL, CA

Fleet scale (estimate)

estimate · estimate

~85
of 1,000 reference target
08.5% → 1000
2025-06-222026-07-30

Active commercial est. ~70–100 (chart 85). TX registered ~181; byCity allocation estimate only after Austin plate/active ramp.(texasavtracker 181 + Austin crowdsource + estimate)

Cities

Austin TX

2025-06-22 · unsup 2026-01-22

Unsupervised

First public commercial launch (safety monitors initially). Limited unsupervised rides from Jan 2026; full Austin Metro unsupervised announced Jun 2026. Aug 31 2026: community-reported service-area expansion (~9% larger, ~264 sq mi; more of North Austin / Pflugerville) — not an official @robotaxi post; not a new city. Official network hours 6am–10pm, 7 days/week as of Aug 26.

Dallas TX

2026-04-18 · unsup 2026-04-18

Unsupervised

Unsupervised commercial service launched with Houston. Aug 29 2026: official @robotaxi expanded Dallas service area (geofence inside existing live city; community estimate ~31 → ~80 sq mi). Not a new city. Official network hours 6am–10pm, 7 days/week as of Aug 26.

Houston TX

2026-04-18 · unsup 2026-04-18

Unsupervised

Unsupervised commercial service launched with Dallas. Aug 8 2026: first community-reported late-night commercial Robotaxi rides in Houston (ops-hours expansion within existing live city; Austin & Dallas also reported running late rides). Official @robotaxi hours as of Aug 26 are 6am–10pm, 7 days/week across live unsupervised cities. Not a new city launch.

Pipeline

Phoenix AZ

preparations underway

Previously named in H1 2026 expansion guidance. Tesla Q2 2026 named Phoenix among next U.S. metros with preparations underway (testing, permitting, first-responder training) — not live. Late Jul 2026: multi-shift Robotaxi Fleet Support hiring in Phoenix (operations prep only). Early Aug 2026: Robotaxi Operations Manager roles listed for Phoenix (ops prep only). Charlotte / New Orleans / San Antonio are separate on-the-ground testing signals, not Q2 named next metros.

Las Vegas NV

NTA permit approved; not live

Previously named in H1 2026 expansion guidance. Tesla Q2 2026 named Las Vegas among next U.S. metros with preparations underway — not live. Aug 20 2026: Nevada Transportation Authority unanimously approved Tesla Robotaxi, LLC to operate up to 5,000 fully autonomous vehicles in Clark County during the first 12 months (paid passenger service subject to ODD/conditions). Permit is a ceiling, not a fleet: inspections, insurance, and rates must still be filed before vehicles may be placed in service; operations must commence within 120 days of permit issuance. Airport pickups need separate Clark County Department of Aviation authorization. Tesla Cybercab chief engineer Eric Early told the Authority 5,000 is a ceiling and ~2,500 in a year would be 'extremely happy.' Do not treat as public commercial / unsupervised live.

San Antonio TX

testing / prep (not live)

Jul–Aug 2026: Zoning commission recommended a private ~56-stall Robotaxi charging facility near Pearl; construction underway at that site as of Aug 8. Aug 20 2026: City Council did not approve or deny the Josephine depot zoning case (Z-2026-10700135 withdrawn before it was called). Separate/second private Robotaxi Supercharger site spotted near airport (Heimer Rd / Target area). Second validation vehicle lot found Aug 8; camera-washer Model Y Supercharger sightings and Cybercab street/lot sightings continue. Robotaxi Fleet Support / Operations Manager hiring. Still testing/prep only — not public commercial service; not unsupervised live. Do not treat as a live city KPI.

Cybercab track

Production underway at GFTX (>125k/yr capacity claimed); Starlink V5 integrated; employee campus rides Jul 2026; Sept 3 Austin launch event scheduled; not mass paid Robotaxi service yet

Robotaxi hero — official Tesla CDN asset
Official product hero (CDN)Courtesy of Tesla, Inc.Official product image ↗
Robotaxi fleet photo from official @robotaxi account
Fleet / “Gold rush” — @robotaxiCourtesy of Tesla, Inc.Official product image ↗
Cybercab production — shared via official Robotaxi channel
Cybercab production (Giga Texas)Courtesy of Tesla, Inc.Official product image ↗
Miami Robotaxi launch — official @robotaxi photo
Miami launch — @robotaxiCourtesy of Tesla, Inc.Official product image ↗
Tampa & Orlando launch — official @robotaxi photo
Tampa & Orlando — @robotaxiCourtesy of Tesla, Inc.Official product image ↗
Cybercab accessibility demo — official @robotaxi photo
Cybercab at NFB convention — @robotaxiCourtesy of Tesla, Inc.Official product image ↗

Claims scorecard

Timeline

  1. cybercab

    Cybercab unveiled at We, Robot

  2. launch

    Robotaxi public launch in Austin (safety monitors)

  3. regulatory

    NHTSA reviews launch videos / incidents

  4. unsupervised

    Unsupervised rides begin (limited) in Austin

  5. launch

    Dallas & Houston unsupervised live

  6. unsupervised

    Unsupervised across entire Austin Metro

  7. cybercab

    Cybercab employee rides on GFTX campus

  8. launch

    Miami unsupervised live (first outside Texas)

  9. pipeline

    New Orleans LA: Model Y Robotaxi testing fleet spotted (not live)

  10. cybercab

    Starlink V5 integrated in Cybercab

  11. launch

    Tampa & Orlando live

  12. corporate

    Q2 update: Cybercab production; 7 major metros; ~2.5M paid miles / 380k+ unsupervised

  13. pipeline

    San Antonio TX: zoning recommended for private Robotaxi charging hub (not live)

  14. pipeline

    Charlotte NC: Cybercab / Model Y testing fleet spotted (not live)

  15. pipeline

    San Antonio TX: Cybercab staging / lot concentration spotted (not public Robotaxi)

  16. ops

    Houston: first reported night commercial Robotaxi rides (ops hours; not new city)

  17. pipeline

    San Antonio TX: second validation lot + second private Robotaxi SC; Pearl hub under construction (not live)

  18. cybercab

    Cybercab launch event scheduled for Sept 3 (Austin / GFTX)

  19. pipeline

    Nevada NTA: Tesla Clark County permit up to 5,000 vehicles (not live)

  20. ops

    Official hours 6am–10pm, 7 days/week; unsupervised fleet 'a lot bigger' (no count)

  21. ops

    Dallas: official Robotaxi service-area expansion (ops; not new city)

  22. ops

    Austin: community-reported geofence expansion ~9% / ~264 sq mi (not official post)

Sources index